来源:Frontiers of Engineering Management 发布时间:2022/1/14 13:10:00
选择字号:
FEM | 《工程管理前沿》2020-2021年正式出版文章合集

期刊:Frontiers of Engineering Management

微信链接:点击此处阅读微信文章

12021 Volume 8 Issue 1 专刊:城市和基础设施工程与管理

专刊:城市和基础设施工程与管理

Special issue: City and infrastructure engineering and management

Weihe HUANG, Chunfang LU, Dongping FANG

基于三个中国工程案例的重大工程建设管理成功驱动因素识别研究

Identifying the driving factors of successful megaproject construction management: Findings from three Chinese cases

Qinghua HE, Junyan XU, Ting WANG, Albert P. C. CHAN

用于建设项目管理研究的系统动力学分析建模方法:重要回顾和未来方向

System dynamics analytical modeling approach for construction project management research: A critical review and future directions

Xiaoxiao XU, Patrick X. W. ZOU

通过模糊系统动态模型对大型项目网络中创新传播和采用策略的理解

Understanding innovation diffusion and adoption strategies in megaproject networks through a fuzzy system dynamic model

Yan ZHANG, His-Hsien WEI, Dong ZHAO, Yilong HAN, Jiayu CHEN

中国城市更新中居民焦虑测度及人口统计变量的影响

Measuring residents’ anxiety under urban redevelopment in China: An investigation of demographic variables

Jinbo SONG, Chen QIAN, Zhuo FENG, Liang MA

大型项目中业主主导的建筑信息模型和精益施工

Owner-dominated building information modeling and lean construction in a megaproject

Mingyue LI,Zhuoling MA,Xi TANG

基于建筑应用的网络物理系统开发

Cyber–physical systems development for construction applications

Chinemelu J. ANUMBA,Abiola AKANMU,Xiao YUAN, Congwen KAN

从低影响力发展战略角度对传统排水系统的生命周期成本分析

Life cycle cost savings analysis on traditional drainage systems from low impact development strategies

Pengfei ZHANG,Samuel T. ARIARATNAM

未来城市将智能和绿色基础设施相结合相比孤岛方案的潜在优势

Potential advantages in combining smart and green infrastructure over silo approaches for future cities

Yamuna KALUARACHCHI

建模并模拟遗忘和通信错误对民用基础设施关闭延迟的影响

Modeling and simulating the impact of forgetting and communication errors on delays in civil infrastructure shutdowns

Zhe SUN, Cheng ZHANG, Pingbo TANG

主余震作用下区域建筑震害预测方法

Regional seismic-damage prediction of buildings under mainshock–aftershock sequence

Xinzheng LU,Qingle CHENG,Zhen XU, Chen XIONG

初始起火期间立式升船机的疏散策略:楼梯和升降机的综合应用

Regional seismic-damage prediction of buildings under mainshock–aftershock sequence

Shu CHEN, Menghan SHANG, Jianping WANG

大型基建项目中管理利益相关者动态和复杂性

Managing stakeholder dynamics and complexity in mega infrastructure projects

Geoffrey Qiping SHEN, Jin XUE

泉州湾跨海大桥主体工程施工管理与技术创新

Construction management and technology innovation for main projects of Quanzhou Bay Bridge

Jun DU, Fangwen WENG

22021 Volume 8 Issue 2

智能工业数据解析与优化

Data analytics and optimization for smart industry

Lixin TANG, Ying MENG

调查关于在建筑工地上结合BIM和最后计划者系统的挑战

Investigating the challenges related to combining BIM and Last Planner System on construction sites

Conrad BOTON, Yaya PITTI, Daniel FORGUES, Ivanka IORDANOVA

分散能源及其绩效评估模型

Decentralised energy and its performance assessment models

Ting WU, Dong-Ling XU, Jian-Bo YANG

交叉效率的方法和应用:回顾和未来展望

Methods and applications of DEA cross-efficiency: Review and future perspectives

Jie WU, Jiasen SUN, Liang LIANG

可再生能源发展和中国路径研究综述

Literature review on renewable energy development and China’s roadmap

Dequn ZHOU,Hao DING,Qunwei WANG,Bin SU

新信息技术时代的制造服务化:运营管理层面的研究

Servitization of manufacturing in the new ICTs era: A survey on operations management

Kangzhou WANG, Zhibin JIANG, Bo PENG, Hui JING

理解实施BIM的障碍:与BIM成熟度相关的跨组织层面的影响

Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity

Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE

大型项目融资系统的适应性演变

Adaptability evolution of financing systems of mega projects

Xue YAN, Longmiao GAO, Huimin LIU

基于合作博弈的中国居住建筑分布式光伏系统成本分摊研究

Benefit-based cost allocation for residentially distributed photovoltaic systems in China: A cooperative game theory approach

Xi LUO, Xiaojun LIU, Yanfeng LIU, Jiaping LIU, Yaxing WANG

是什么使行业成功追赶?中国LED产业的总体框架和案例研究

What makes a successful industry-level catch-up? General framework and case study of China’s LED industry

Bin GUO, Peng DING, Frans J. A. M. GREIDANUS, Wen (Helena) LI

欧盟和国际海事组织(IMO)检测船舶二氧化碳新举措的三项潜在益处

Three potential benefits of the EU and IMO’s landmark efforts to monitor carbon dioxide emissions from shipping

Shuaian WANG, Lu ZHEN, Harilaos N. PSARAFTIS

北斗系统工程管理模式的创新与发展

Innovation and development of BeiDou Navigation Satellite System (BDS) project management mode

Changfeng YANG

32021 Volume 8 Issue 3

基于新视角的排序择优问题研究综述

Review on ranking and selection: A new perspective

L. Jeff HONG, Weiwei FAN, Jun LUO

智慧物流运营管理:综述及未来研究

Operations management of smart logistics: A literature review and future research

Bo FENG, Qiwen YE

做正确的PLS和正确地做PLS:在施工管理研究中应用PLS-SEM的批判性回顾

Do right PLS and do PLS right: A critical review of the application of PLS-SEM in construction management research

Ningshuang ZENG, Yan LIU, Pan GONG, Marcel HERTOGH, Markus KÖNIG

电动车辆问题综述:变种问题及算法

A review on the electric vehicle routing problems: Variants and algorithms

Hu QIN, Xinxin SU, Teng REN, Zhixing LUO

中国地热能产业战略分析

Strategic analysis of China’s geothermal energy industry

Hao GONG, Baicun WANG, Haijun LIANG, Zuoxian LUO, Yaofeng CAO

水电EPC项目管理协同度及其影响因素分析

Analysis of synergy degree and its influencing factors in hydropower EPC project management

Jiwei ZHU, Hua GAO, Jiangrui WANG

在沉浸式和非沉浸式虚拟环境中进行设计审查时识别子组件并了解其功能

Identifying subassemblies and understanding their functions during a design review in immersive and non-immersive virtual environments

Fanika LUKACEVIC, Stanko ŠKEC, Peter TÖRLIND, Mario ŠTORGA

通过改进和整合现有管理技术,开发基于 BIM 的精益施工生产计划和控制系统

Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques

Christoph Paul SCHIMANSKI, Gabriele PASETTI MONIZZA, Carmen MARCHER, Dominik T. MATT

精益生产视角下建设项目绩效考核体系要求

Requirements in performance measurement systems of construction projects from the lean production perspective

Karina B. BARTH, Carlos T. FORMOSO

对液态空气储能的减碳潜力进行的高水平技术经济评价

The carbon dioxide removal potential of Liquid Air Energy Storage: A high-level technical and economic appraisal

Andrew LOCKLEY, Ted von HIPPEL

VUCA时代的供应链弹性管理

Managing supply chain resilience in the era of VUCA

Ying GAO, Zhuo FENG, Shuibo ZHANG

“华龙一号”全球首堆示范工程技术与管理创新

Technology and management innovation of the first-of-a-kind (FOAK) demonstration project — HPR1000

Ji XING, Tianlei ZHEN, Hang YU, Yanling ZHENG

42021 Volume 8 Issue 4 专刊:复杂系统可靠性管理

专刊:复杂系统可靠性管理

Jianjun WU, Daqing LI, Shubin SI, Ziyou GAO

川藏铁路工程系统可靠性保障体系框架研究

Chunfang LU, Yongjie PAN, Chaoxun CAI

中国可靠性系统工程发展现状与展望

Zili WANG

信息物理电力系统(CPPS):系统韧性的测度和优化方法综述

Gongyu WU, Zhaojun S. LI

考虑多次周期检测的序贯退化老化测试

Jiawen HU, Qiuzhuang SUN, Zhi-Sheng YE, Xiaoliang LING

电力网络与电信网络的可靠性指标概述

Yan-Fu LI, Chuanzhou JIA

基于部件恢复优先级的电网系统改进弹性度量

Guanghan BAI, Han WANG, Xiaoqian ZHENG, Hongyan DUI, Min XIE

基于渗流的复杂交通系统健康管理

Guanwen ZENG, Zhiyuan SUN, Shiyan LIU, Xiaoqi CHEN, Daqing LI, Jianjun WU, Ziyou GAO

基于网络解耦方法的神经网络可解释新机制

Dongli DUAN, Xixi WU, Shubin SI

川藏铁路建设项目中的风险预警技术和应急响应机制

Liujiang KANG, Hao LI, Cong LI, Na XIAO, Huijun SUN, Nsabimana BUHIGIRO

借助基于场景的“位置-时间-速度”网络的鲁棒列车速度曲线优化

Yu CHENG, Jiateng YIN, Lixing YANG

系统可靠性及系统韧性

Mingjian ZUO

嫦娥五号月面采样返回工程管理创新

Jizhong LIU, Hao HU, Zhaoyu PEI, Qiong WANG, Qiang MAI

52020 Volume 7 Issue 1

航空公司计划与调度: 模型和求解方法

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

大数据环境下系统评价与改进研究综述

A review of systematic evaluation and improvement in the big data environment

Feng YANG, Manman WANG

碳信息披露研究综述

Overview of research on carbon information disclosure

Yue-Jun ZHANG, Jing-Yue LIU

建筑模块化风险:综述与未来研究方向

Risks of modular integrated construction: A review and future research directions

Ibrahim Yahaya WUNI, Geoffrey Qiping SHEN, Bon-Gang HWANG

BIM对教育的深刻影响

Toward deep impacts of BIM on education

Ziga TURK, Andreja ISTENICSTARCIC

基于BIM的建筑物运行效率实时监测系统的开发

Development of a BIM-based holonic system for real-time monitoring of building operational efficiency

Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI

为基于4D的协同决策制定识别项目参与者角色和相关文件

Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making

Veronika BOLSHAKOVA, Annie GUERRIERO, Gilles HALIN

BIM使用过程的通用影响因素和特定于中小企业的影响因素概述

Generic and SME-specific factors that influence the BIM adoption process: An overview that highlights gaps in the literature

Elodie HOCHSCHEID, Gilles HALIN

基于构建信息模型、混合现实和支持设施管理信息流的云平台框架

Framework based on building information modeling, mixed reality, and a cloud platform to support information flow in facility management

Berardo NATICCHIA, Alessandra CORNELI, Alessandro CARBONARI

中等规模的承包商是否仍应在建筑工地实施自主研发信息技术?

Should medium-sized contractors still implement home-made information technologies on construction sites?

Conrad BOTON, Éric ST-PIERRE, Gabriel LEFEBVRE

全球工程管理研究前沿

Engineering management: Global engineering research frontiers

Botao ZHONG, Luting QIU

西气东输天然气管道工程

West-East Gas Pipeline Project

Junqiang ZHANG, Honglong ZHENG, Wenyuan HE, Weihe HUANG

62020 Volume 7 Issue 2 专刊:决策、风险解析和数据智能

专刊:决策、风险解析和数据智能

Special issue: Decision, risk analytics and data intelligence

Xiaozhe ZHAO, Desheng WU

嵌入式硬软件的系统过时管理

Managing obsolescence of embedded hardware and software in secure and trusted systems

Zachary A. COLLIER, James H. LAMBERT

公司治理对银行风险的影响

Corporate governance impact on banking risk

Mahdi JEMMALI,Bassem SALHI

基于勾股模糊集的质量机能展开改进方法及其在装配机器人设计评估中的应用

Improved approach to quality function deployment based on Pythagorean fuzzy sets and application to assembly robot design evaluation

Huchang LIAO, Yinghan CHANG, Di WU, Xunjie GOU

收敛到实时决策

Convergence to real-time decision making

James M. TIEN

基于多模式财务的项目调度问题的多目标优化

Multi-objective optimization for the multi-mode finance-based project scheduling problem

Sameh Al-SHIHABI, Mohammad AlDURGAM

基于智能知识管理的新技术预测方法

New technology foresight method based on intelligent knowledge management

Lingling ZHANG, Siting HUANG

考虑运营资本需求金融成本的双层无产能限制的生产计划优化问题

Two-level uncapacitated lot-sizing problem considering the financing cost of working capital requirement

Yuan BIAN, David LEMOINE, Thomas G. YEUNG, Nathalie BOSTEL

混合两阶段非均匀网络过程的效率测量共享额外的中间资源

Efficiency measurement for mixed two-stage nonhomogeneous network processes with shared extra intermediate resources

Qingxian AN, Xuyang LIU, Shijie DING

对冲基金收益分配中的类期权性质

Option-like properties in the distribution of hedge fund returns

Katharina DENK, Ben DJERROUD, Luis SECO, Mohammad SHAKOURIFAR, Rudi ZAGST

支持可持续城市能源规划的大数据:EvoEnergy项目

Big Data to support sustainable urban energy planning: The EvoEnergy project

Moulay Larbi CHALAL, Benachir MEDJDOUB, Nacer BEZAI, Raid SHRAHILY

知识管理的风险方面

Risk aspects of knowledge management

David OLSON

“天路”:青藏铁路

“Heavenly Road”: The Qinghai–TibetRailway

Yongfu SUN

72020 Volume 7 Issue 3

基于物联网的智能农业运营管理综述

Review of operational management in intelligent agriculture based on the Internet of Things

Xiangpei HU,Lijun SUN,Yaxian ZHOU, Junhu RUAN

基于状态维保的综述:关于预后与运营决策的改进

A review of condition-based maintenance: Its prognostic and operational aspects

Yanrong LI,Shizhe PENG,Yanting LI,Wei JIANG

重要度驱动的系统可靠性优化方法

Recent advances in system reliability optimization driven by importance measures

Shubin SI,Jiangbin ZHAO,Zhiqiang CAI, Hongyan DUI

最后计划者系统和Scrum:比较分析和调整建议

Last Planner System and Scrum: Comparative analysis and suggestions for adjustments

Roshan POUDEL, Borja GARCIA de SOTO, Eder MARTINEZ

石油和石化生产计划和调度的发展和挑战

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI,Minglei YANG,Wenli DU, Xin DAI

工程咨询服务中项目管理的成熟度:以中国世博会为例

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Beverly PASIAN, Yan ZHANG

利用VR与BIM集成在设计阶段促进实时创建工程量清单:概念验证研究

Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: A proof of concept study

Jordan DAVIDSON,John FOWLER,Charalampos PANTAZIS, Massimo SANNINO, Jordan WALKER, Moslem SHEIKHKHOSHKAR, Farzad Pour RAHIMIAN

企业创新体系:增强企业本土创新能力的途径

Firm innovation system: Paths for enhancing corporate indigenous innovation capability

Jin CHEN,Ximing YIN,Jizhen LI

基于实物期权的公私伙伴关系基础设施项目中的财政激励分配优化

Real option-based optimization for financial incentive allocation in infrastructure projects under public–private partnerships

Shuai LI, Da HU, Jiannan CAI, Hubo CAI

双目标资源受限项目调度的混合遗传算法

Hybrid genetic algorithm for bi-objective resource-constrained project scheduling

Fikri KUCUKSAYACIGIL,Gündüz ULUSOY

地方政府在促进新兴产业发展中的作用:以市场为导向的政策视角

Role of local governments in fostering the development of an emerging industry: A market-oriented policy perspective

Jun JIN,Maureen McKELVEY,Ying DONG

智能方舱医院的建设和运营能够有效应对COVID-19疫情

Intelligent technologies help operating mobile cabin hospitals effectively cope with COVID-19

Ying ZHOU,Lingling WANG,Lieyun DING, Zhouping TANG

大型液化天然气船

Large-scale liquefied natural gas ships

Danping LOU,Yan LI

82020 Volume 7 Issue 4 专刊:区块链技术应用

专刊:区块链技术应用

Special issue: Blockchain technology application

Hongfeng CHAI, Xiaohong CHEN, Hongwei WANG

基于银联网络的数字货币信息系统设计

Design of a digital currency information system based on the UnionPay network

Hongfeng CHAI, Quan SUN, Yu ZHOU, Tao ZHU

基于区块链通证的基础设施融资

Finance infrastructure through blockchain-based tokenization

Yifeng TIAN, Zheng LU, Peter ADRIAENS, R. Edward MINCHIN, Alastair CAITHNESS, Junghoon WOO

面向中小企业的区块链驱动下供应链金融解决方案

Blockchain-driven supply chain finance solution for small and medium enterprises

Jian LI, Shichao ZHU, Wen ZHANG, Lean YU

基于Hyperledger Fabric联盟链的施工质量信息管理

Hyperledger fabric-based consortium blockchain for construction quality information management

Botao ZHONG, Haitao WU, Lieyun DING, Hanbin LUO, Ying LUO, Xing PAN

基于区块链的预制建筑质量追溯系统:一个集成框架

The quality traceability system for prefabricated buildings using blockchain: An integrated framework

Ziyao ZHANG, Zhenmin YUAN, Guodong NI, Han LIN, Yujie LU

面向区块链技术的建筑供应链:对其潜力和未来方向的研究面向区块链技术的建筑供应链:对其潜力和未来方向的研究

Preparing construction supply chains for blockchain technology: An investigation of its potential and future directions

Algan TEZEL, Eleni PAPADONIKOLAKI, Ibrahim YITMEN, Per HILLETOFTH

区块链应用于建筑供应链:一项风险模型案例研究

Blockchain applied to the construction supply chain: A case study with threat model

Gjorgji SHEMOV, Borja GARCIA de SOTO, Hoda ALKHZAIMI

区块链在智能制造领域的应用:理论基础、现实困境和发展建议

Application of blockchain in the field of intelligent manufacturing: Theoretical basis, realistic plights, and development suggestions

Qiang ZHANG, Baoyu LIAO, Shanlin YANG

基于区块链的多种矿产资源数据共享机理研究

Data sharing mechanism of various mineral resources based on blockchain

Yili REN, Jia LIANG, Jian SU, Gang CAO, He LIU

基于区块链技术的健康数据银行服务模式研究

Blockchain application in healthcare service mode based on Health Data Bank

Jianxia GONG, Lindu ZHAO

基于专利视角的区块链技术发展分析

Comments on the development of blockchain technology from the perspective of patent analysis

Wenhong LI, Chunxiao FU, Deli CHENG

五兆瓦海上风电机组提质增效技术研究及应用

Quality and efficiency improvement technology for five megawatt offshore wind turbines and its application

Huali HAN, Yalin LIU, Can WANG

推荐阅读

1. Mar 2021, Volume 8 Issue 1 城市和基础设施工程与管理专题内容摘要

2. Jun 2021, Volume 8 Issue 2目录摘要

3. Sep 2021, Volume 8 Issue 3目录摘要

4. Dec 2021, Volume 8 Issue 4 复杂系统可靠性管理专题内容摘要

5. Dec. 2020, Volume 7 Issue 4 区块链技术应用专题摘要

6. Sep 2020,Volume 7 Issue 3 内容摘要

7. Jun 2020, Volume 7 Issue 2 决策、风险解析和数据智能专题内容摘要

8. Mar 2020,Volume 7 Issue 1 内容摘要

Frontiers of Engineering Management

《工程管理前沿》(英文刊)

Yong LI (李勇)

Huiwen DONG (董惠文)

Tel:+86- 27-87540191

E-mail:fem@hust.edu.cn

Linan ZHANG(张丽南)

Tel:+86- 10-58581429

E-mail:zhangln@hep.com.cn

投稿网站:

https://mc.manuscriptcentral.com/fem

官方网站:

http://journal.hep.com.cn/fem

https://www.springer.com/journal/42524

https://www.engineering.org.cn/ch/journal/fem

《前沿》系列英文学术期刊

由教育部主管、高等教育出版社主办的《前沿》(Frontiers)系列英文学术期刊,于2006年正式创刊,以网络版和印刷版向全球发行。系列期刊包括基础科学、 、工程技术和人文社会科学四个主题,是我国覆盖学科最广泛的英文学术期刊群,其中13种被SCI收录,其他也被A&HCI、Ei、MEDLINE或相应学科国际权威检索系统收录,具有一定的国际学术影响力。系列期刊采用在线优先出版方式,保证文章以最快速度发表。

中国学术前沿期刊网

http://journal.hep.com.cn

特别声明:本文转载仅仅是出于传播信息的需要,并不意味着代表本网站观点或证实其内容的真实性;如其他媒体、网站或个人从本网站转载使用,须保留本网站注明的“来源”,并自负版权等法律责任;作者如果不希望被转载或者联系转载稿费等事宜,请与我们接洽。
打印 发E-mail给:
相关新闻 相关论文
图片新闻
科学家揭示超铁元素核合成新机制 6000年古迹揭示石器时代建筑者的工程智慧
森林可持续经营:给陆地碳汇扩容 研究生迷茫常见原因及应对之策
>>更多
一周新闻排行
编辑部推荐博文
Baidu
map